Sunday, December 11, 2016

Office and bedrooms are primed

 We are almost ready to paint. All of the downstairs is primed. We only have the two bedrooms upstairs to finish mudding and priming. I say "we" but I really mean Martin. 
Soon we will be discussing color schemes. Wish me luck!







Saturday, December 3, 2016

Heat and hot water systems have been installed

Having the wood stove installed was a great improvement over no heat, but it worked like a tether. Martin couldn't be gone long from Cornish, not with the season fast approaching winter and winter temperatures. We have had several frosts and snow flakes have been reported.

came and installed our on demand hot water heater and our propane wall furnace.
Now Martin doesn't have to worry about how long he may be gone from an tigin.