Saturday, September 13, 2014

three done, one to go


 The foundation walls on the east (above) and north (below) for Martin's workshop are done.
 The west (below) foundation wall is done too. 


Thursday, September 11, 2014

One down, Three to go.

All the footers for the foundation of Martin's workshop (aka barn) have been poured. Guess I don't need to spend every weekend in September mixing concrete. THANK YOU, MARTIN!





And we have the first wall (well half wall because this side of the workshop ties into the house) done.  Only three more (full walls) to go.


Sunday, September 7, 2014

6 month progress report

It feels like we have made more progress in the last 6 months than in the first year. I guess that is partly because a lot of the first year was used in emptying out junk and demolition. Then winter hit and slowed down construction progress

Day 1 (March, 2013)






First Anniversary (March, 2014)












September, 2014



 Above - dining room and kitchen
Stairs to the second floor.

 Above - Office on the first floor.
Below - Living room, looking at the bay window.

Below - Upstairs back bedroom

 Above - Back bedroom on the left, bathroom on the right.
Below - Front bedroom.

 Above - Second floor 3/4 bath.
Below - First floor full bath.

 Above - Opening for stairs to basement (no stairs yet).
 Basement retaining walls finished

Bulkhead stairs to the basement.