Friday, November 29, 2013

joists in

We have most of the joists for the main floor in.  The only ones that need to be finished up are the ones that go in the front section of the 4 foot addition toward the east, plus the one that will be put in as soon as we take the east wall of the house down.



 We also have some of the decking down.  We have to keep it well covered!  We've had a bit of weather lately.



Wednesday, November 27, 2013

Thanksgiving

Martin and I are headed to my mom's today, through a very heavy rainstorm (better than snow). We won't be posting tomorrow, November 28th.

first floor


The first set of joists for the first floor of an tigin are ready to be installed.