Of course, once the joists were installed, everything needed to be tarped to protect it from the elements.
Renovation of a 400 square foot house built in 1922 located in Cornish, Maine. The original foundation was 20 feet by 20 feet. At some point in the house's history a small (10' x 8') addition was put on the back. Later that addition was removed and enlarged to an addition the full width of the house and remained 8 foot deep.
Monday, March 31, 2014
joists on the north side
Once the north wall was in place, Martin could start installing the joists for the second floor. He had to take the planking off of the north side of the roof and then adjust the slope to all space for joists and their installation
Sunday, March 30, 2014
north wall installed
Martin has the north wall installed and wrapped. The window is temporary, but light was needed to allow work to continue inside.
Wednesday, March 26, 2014
2nd floor underlayment and bridging
Half of the floor for the second floor is in. Martin has the joists in and the underlayment is down. Martin has the bridging in.