The second story is slowly being added. Martin started with the front wall of the second story. It made an tigin look like a building with a false front from an old western town.
The front porch is mostly done, with the roof included. We need to put a railing on the end of it and regrade/landscape the front yard.
Martin built a section of the east wall. Then he and I installed it. This was not a fun job! That section of east wall is above the stairs, so we needed to move the wall into place over the open stairwell.
Then we got a section of the second story west wall installed. This was a much easier job than the east wall. The wall is stepped because the roof pitch comes down at a steep enough angle so that the very front of the second floor is slightly shorter than the rest of it.
No comments:
Post a Comment