Sunday, January 4, 2015

mud room progress

The mud room is enclosed.
Since the daytime high temperature is usually below freezing, we weren't able to stain the boards in place. So, Martin measured and cut the boards on site. Then he hauled them home. The living room at home was turned into a workshop and we stained the boards. Once they were dry, Martin hauled them back to an tigin and installed them. Then he would measure and cut the next section and the process was repeated.
The stairs are temporary and new ones will be built at some point.




No comments:

Post a Comment