We've run the pex water lines for all of the fixtures. The upstairs bathroom and washer are all set. The downstairs bathroom and kitchen sink are all set. Martin even ran the lines for the two outside faucets. The lines have been pressure tested and we are only waiting for the weather to be a bit more consistently warm (we have had a range from 70 degrees to 10 degrees lately) to have the water turned back on.
No comments:
Post a Comment