Sunday, January 22, 2017

Bathrooms are painted

This weekend Martin and I concentrated on getting both bathrooms painted. 
We succeeded!
 The picture below shows the color the best. We are using CFL bulbs which seem to add a yellow hue to the walls.

 The pictures above are the upstairs bathroom and the pictures below are the downstairs bathroom.



Wednesday, January 18, 2017

the beginnings of a real kitchen

 Just this past weekend, I had the pleasure of helping Martin start putting kitchen cabinets in.


 Luckily he is talented enough to do the job by himself. 
We needed to exchange a damaged upper cabinet before we could move forward.
Martin ended up finishing the job without me.
 He also started the vintage kitchen sink installation. 
Next he needs to refurbish the vintage gas cook range before it can go in.



Wednesday, January 11, 2017

Tiling

Tiling floors always starts with putting down special underlayment. Martin has both bathrooms and the kitchen/dining room ready to be tiled. 
He will start with the shower and bathtub surrounds first. Then both bathrooms get painted before floor tile gets put down.
Nothing like scraping paint of of brand-new tile! We want to avoid that as much as possible.


Martin set up the wet saw in the window reading nook so he could protect the surrounding area with plastic, since wet saws splatter a bit.



 The downstairs bathtub surround is tiled. Martin needed to adapt some of the fixtures before he could grout.
Of course, Martin came up with a solution to the fixture problem and the tub is grouted.

 Kitchen/Dining room floor is tiled.
The darker tiles are where the cabinets are going to go. The lighter tiles designate the dining room area.

The upstairs shower in progress.
Upstairs shower tiled and grouted.