Sunday, December 22, 2013

Slow progress

The roof shingles on the east side of the house have been removed.  The wall under this side of the roof needs to be taken down so the joists and underlayment can be finished.  The shingles were loaded into the trailer, which had to be dug out of the snow.



 That section of the roof is tarped.

Everything needs to be tarped at the end of the day to protect it from the weather. That takes time from actual construction work.  Then at the beginning of every day, Martin has to untarp the area where he is working. If he is working in the rain, the tarps need to stay in place.  Tarping, untarping, and working around tarped areas just slows everything down.