The north wall and the end of the east wall are framed.
The sections of north wall are sheathed and ready to be installed.
The north end of the east wall is framed in. Martin will sheath it after it is installed.
Martin is in the process of building the load bearing interior walls. Then he will be installing the joists for the second floor at the same time the rest of the exterior walls get installed.