Monday, June 30, 2014

Second story almost done

Martin needed to match the depth of the sheathing between the second and first stories. Martin had planned on building the wall on the second story that is needed to support the rafters, but ended up spending the day fiddling with sheathing. 

In the picture above Martin has matched the sheathing. In the picture below, still needs to match top and bottom sheathing.

 Walls are done and wrapped.

No comments:

Post a Comment