Friday, October 10, 2014

Regrading, slow but steady

The stump hole has been filled in.
We will be moving sod to cover this area soon.
 The side yard is nearly up to grade.
 Just this little bit of the front still to do.

Tuesday, October 7, 2014

barn renovations

Martini stripped the barn down to its bare bones.

 Then he replaced anything that was rotten.
 Now he is in the process of putting up rafters. He is using the floor joists from the house for rafters.
The old roof on the west side of the barn was not a straight line. It looked like an addition had been put on the barn at some point, or it was originally designed to look that way. To facilitate snow removal from the roof and to clean up the lines of the barn, it is now a straight roof.

 The roof on the east side of the barn needs to tie into the house, so Martin needed to rebuild it with snow, rain, etc. issues in mind.

Saturday, October 4, 2014

finding a match to the hinges we had

While in the process of renovating the barn, Martin took the doors off.  They had been held on by 4 hinges and there was a fifth matching hinge floating around.  At some point, once the barn has renovated walls, sheathing put back on, and a new metal roof, Martin will build new doors for the barn. Because of the weight of the doors he wanted each door to be held on by 3 hinges.  That meant we were short one hinge.
Cornish has lots of antique shops. We were convinced that a trip through the shops would turn up a matching hinge or even pair of hinges.
No luck.
I tried to stop by a salvage yard on a day that it was scheduled to be open - it was closed.
No luck.
Then while carpooling to work with a friend, I mentioned the struggles of trying to find a hinge.
Her quick reply was, "I assume you've looked on-line."
Well, umm, actually neither Martin nor I had even considered it.
As soon as I got home that night, I got on-line and within a few minutes had ordered 3 matching hinges, which have already arrived.
So, hats off to my co-worker for solving our hinge dilemma!