Sunday, June 23, 2013

One more thing checked off of the miles long renovation list


Martin had two of the three kitchen addition walls down by Friday afternoon.  That left an easy day for us on Saturday.  In less than two hours we had the third wall down, nails removed, wood stacked, and the truck loaded with metal that we were taking to be recycled. 
Martin had already taken rotten wood from the roof and the two walls and shingles from the roof to the waste center and gotten rid of it.  We have some salvageable lumber from the third wall and a pile of wood that we will haul off soon.



No comments:

Post a Comment