Martin and I spent a chunk of time hauling rocks from one of the rock piles to start to back fill around the foundation.  Rocks don't hold water and will require less compacting than if we had filled with sand.  We did shovel sand from the piles to fill the gaps between the rocks (in front - we still need to cover the rocks on the side with sand.)






This is the rock pile we are pulling from for now.  By using rocks, we are getting rid of the rock piles too.