Monday, November 4, 2013

final foundation wall


The north foundation wall has been started.  As long as the weather holds (we were supposed to get snow last night, but didn't), we'll be able to get it finished.  Then Martin needs to fill every third core with a soupy kind of a concrete/mortar mix for strength. After the cores are filled the solid cap blocks get put on. If we are really, really lucky with the weather, we'll be able to water proof this wall too.







No comments:

Post a Comment