The second coat went on much better. We bought a second 5 gallon bucket of the water proofing and asked the paint department to agitate it. (Smart thinking Martin) We also were lucky because we had a unseasonably (read 60 degree) Saturday to put it on. That meant that Martin and I both could work furiously to make sure all of the finished foundation walls were well coated the second time. I got to do the east 31 foot long wall and most of the west 31 foot long wall, plus a bit of the front (south) wall. Martin climbed into the hole to get the south wall which is oaver 6 foot deep, 24 foot long, and includes the bulkhead area.
The only bit left is the north foundation wall which is still under construction.