The next step is working on the barn since the barn roof needs to tie into the house roof. Martin wants to add a foundation to the barn (it was simply built on the ground). Then he can replace rotten walls and roof. Once the barn has a new roof, we will be able to order metal roofing and roof both the house and the barn.
In the mean time, we need to empty the barn. There isn't enough room in the house to store everything. We have brought some stuff back home and moved the new lumber to the house. The salvaged old lumber that will be used in replacing rotten parts of the barn will be stored in this temporary shed (which took us almost two days to put up).
No comments:
Post a Comment